Doing Work
Source:
January 12, 2009
Problem Statement
takes times as long to do a piece of work as and together; takes times as long as and together; and takes times as long as and together. Then , in terms of and , is:
(A)\ \frac {2mn}{m \plus{} n} \qquad (B)\ \frac {1}{2(m \plus{} n)} \qquad (C)\ \frac {1}{m \plus{} n \minus{} mn} \qquad (D)\ \frac {1 \minus{} mn}{m \plus{} n \plus{} 2mn} \qquad (E)\ \frac {m \plus{} n \plus{} 2}{mn \minus{} 1}